Portfolio

Simulation of Passengers Flow in the Terminal Buildings of International Airports JUL, PEM, and TCQ from the Republic of Peru. Scenarios 2024 and 2036 

  • Authors: IGAMT members and GTA from UNLP
  • Location: La Plata, Lima and Amsterdam
  • Short Description: Evaluate using simulation, the fulfillment of the standards for the new terminal in 2024 and 2036. The study focused on domestic and international passengers. The study was framed within the consultancy call “Update of Development of Master Plans” from the 2nd group of Airports in the Republic of Peru.
  • Customer: CEMOSA
  • Date: January 2022- up to date

Simulation of Flow Passengers in the Terminal Building of International Airport Alfredo Rodriguez Ballon from Arequipa (AQP).From the Call “Building of Passenger Terminal” Scenarios 2027 

  • Authors: IGAMT members and GTA from UNLP
  • Short Description: Evaluate using simulation, the fulfillment of the standards for the new terminal in 2027. The study focused on domestic and international passengers.
  • Customer: UG21 – Engineering Consultants
  • Date: From November 2021 – Up to date

Simulation of Flow Passengers in the two Terminal Buildings of International Airport Alfredo Rodriguez Ballon from Arequipa (AQP). Scenarios 2024 and 2036  

  • Authors: IGAMT members and GTA from UNLP
  • Short Description: Evaluate using simulation, the fulfillment of the standards for the new terminal in 2024 and 2036. The study focused on domestic and international passengers. The study was framed within the consultancy call “Update of Development of Master Plans” from the 2nd group of Airports in the Republic of Peru.
  • Customer: CEMOSA & AYESA
  • Date: July to November 2021

Simulation of Flow Passengers in Terminal Building of Airport Coronel FAP Alfredo Mendivil Duarte de Ayacucho (AYP). Scenarios 2024 and 2036

  • Authors: IGAMT members and GTA from UNLP
  • Short Description: Evaluate using simulation, the fulfillment of the standards for the new terminal in 2024 and 2036. The study was framed within the consultancy call “Update of Development of Master Plans” from the 2nd group of Airports in the Republic of Peru.
  • Customer: CEMOSA & AYESA
  • Date: July to August 2021

Analysis of Airspace Feasibility in New Airport of Mexico City

  • Short Description: We analyzed the airspace feasibility of the simultaneous operation of the Airport of Mexico City with the new airport Felipe Angeles.
  • Customer: Mexican Government
  • Date:Dec 2018 – Feb 2019

Operational Analysis of SeaBubbles in The Netherlands

  • Short Description:We analyzed the operation and different KPIs of the introduction of SeaBubbles for the transport of passengers on-demand in the region of Rotterdam, The Netherlands.
  • Customer: SeaBubbles and Waternet
  • Date: August 2019

Analysis of Post-Covid19 operation in Airport Terminals

  • Short Description:We analyzed the impact of the proposed measures in Aiport Terminals in terms of capacity and potential problems that might arise. The draft of the paper (under publication) can be found
  • Customer: Airport of Mexico City
  • Date: March- April 2020